FOURFEETZ · FREE TOOL 03
AI Video Production Cost Calculator
Budget for retries as well as the first generation. Enter your service's credit price and the number of attempts per shot to estimate usage, its allocated cost and the amount required to buy whole credit packs.
Free · No signup · No file upload
Your result
Allocated usage cost
$3,000.00
- Total generations
- 15
- Credits required
- 300
- Whole packs to buy
- 1
- Whole-pack purchase cost
- $10,000.00
- Credits left after project
- 700
- Final length before transitions / trimming
- 30 sec
Assumes zero starting credits. Excludes taxes, currency conversion, base subscriptions, editing, music and labor.
Shared links include the numbers you enter.
How to use it
- Enter final shot count and total attempts per shot, including the first generation.
- Enter credits per generation, credits per pack and your pack price.
- Compare allocated usage cost with whole-pack purchases and unused credits.
Worked example
Five shots with three attempts each at 20 credits use 300 credits. If a 1,000-credit pack costs 10,000 in your chosen currency, the allocated cost is 3,000. Buying from a zero balance requires one full pack at 10,000.
Formula and assumptions
Total credits = shots × total attempts per shot × credits per generation. Allocated cost = total credits ÷ pack credits × pack price. Pack purchases round up to whole packs.
- The tool does not fetch current provider prices. Enter the rates shown for your model, resolution and generation length.
- Pack purchases assume a zero starting balance. Taxes, currency conversion, subscription base fees, editing, music and labor are excluded.
- Final runtime equals shot count × usable seconds per shot. Allow separately for transitions, trimming and failed outputs.
Frequently asked questions
Do attempts include the first generation?
Yes. One first generation plus two retries is three total attempts.
Why do usage cost and purchase amount differ?
Credits are sold in packs. You may need to buy a whole pack even when your project uses only part of it; the unused balance is shown separately.
Is this a complete client quote?
No. It estimates generation-credit spending. A quote may also need planning, editing, revisions, audio, labor and applicable taxes.
Your next production step
